Articles | Volume 22, issue 4
https://doi.org/10.5194/os-22-2491-2026
https://doi.org/10.5194/os-22-2491-2026
Technical note
 | 
17 Aug 2026
Technical note |  | 17 Aug 2026

Evaluate the impact of a 4 h tandem phase on the continuity of nadir altimetry measurements between S3 and S3NG-T

Noémie Lalau, Michaël Ablain, Thomas Vaujour, François Boy, Gerald Dibarboure, and Alejandro Egido

Download

Interactive discussion

Status: closed

Comment types: AC – author | RC – referee | CC – community | EC – editor | CEC – chief editor | : Report abuse
  • RC1: 'Comment on egusphere-2025-6364', David Cotton, 22 Jan 2026
    • AC2: 'Reply on RC1', Noémie Lalau, 06 May 2026
  • RC2: 'Comment on egusphere-2025-6364', Anonymous Referee #2, 08 Apr 2026
    • AC1: 'Reply on RC2', Noémie Lalau, 06 May 2026
  • EC1: 'Comment on egusphere-2025-6364', Karen J. Heywood, 08 Apr 2026
    • AC3: 'Reply on EC1', Noémie Lalau, 06 May 2026

Peer review completion

AR – Author's response | RR – Referee report | ED – Editor decision | EF – Editorial file upload
AR by Noémie Lalau on behalf of the Authors (19 May 2026)  Author's response   Author's tracked changes   Manuscript 
ED: Referee Nomination & Report Request started (23 May 2026) by Karen J. Heywood
RR by David Cotton (26 May 2026)
ED: Publish subject to technical corrections (27 May 2026) by Karen J. Heywood
AR by Noémie Lalau on behalf of the Authors (04 Jun 2026)  Manuscript 
Download
Short summary
We investigated how to maintain continuous sea level measurements between current Sentinel-3 constellation and the upcoming Sentinel-3 Next Generation Topography mission. Because of new satellite designs, a 4-hour delay will exists between observations during the calibration phase. By simulating this time lag, we found that, despite increased uncertainty, reliable calibration is possible. Extending this phase to one year ensures a stable, long-term record for climate and ocean monitoring.
Share